How Long Does It Take to Replace Windows?

The complete timeline from first enquiry to finished installation. What to expect at every stage and how to avoid delays.

πŸ‡¬πŸ‡§ Made in Britain ⚑ 4–5 Week Delivery

The Complete Timeline

StageDurationWhat Happens
1. Design & quoteSame dayUse our 3D configurator to design and price your windows online. Instant budget price.
2. Site survey1–2 weeks to bookWe visit your property, take precise measurements, check structural conditions, and confirm the specification.
3. Final quote2–3 days after surveyYou receive a detailed quote based on actual survey measurements. No surprises.
4. Production4–5 weeksYour windows are manufactured in our UK workshop. Timber preparation, machining, assembly, glazing, and painting.
5. Installation1–2 windows per dayOur FENSA-certified team removes old windows and installs new ones. Minimal disruption.
6. CompletionSame day as installFinal adjustments, clean-up, and handover. FENSA certificate issued.

For a typical London terraced house with 6–8 windows, the total timeline from first enquiry to completed installation is approximately 7–9 weeks: 1–2 weeks for survey and quoting, 4–5 weeks for production, and 3–4 days for installation.

What Can Cause Delays?

Planning Permission

Most window replacements do not need planning permission. However, if your property is in a Conservation Area or is a Listed Building, you may need consent before work begins. Conservation Area applications typically take 6–8 weeks; Listed Building consent can take 8–12 weeks. We can advise whether permission is needed during the survey stage.

Structural Issues

If the survey reveals structural problems β€” crumbling lintels, rotten sub-sills, damaged brickwork β€” these need to be addressed before or during installation. We flag these during the survey so there are no surprises on installation day.

Access and Scaffolding

Ground-floor and first-floor windows can usually be installed from ladders. Higher floors or difficult access may require scaffolding, which needs to be arranged in advance. We coordinate scaffolding as part of our installation service.

Bespoke Designs

Standard configurations (rectangular sash and casement windows) are delivered in 4–5 weeks. Arched windows, shaped frames, and other bespoke designs may require additional production time, which we confirm at the point of order.

How to Speed Things Up

How Many Windows Can Be Installed Per Day?

A two-person installation team typically fits 1–2 full box frame sash windows per day, including removal of old frames, preparation of the opening, installation, sealing, and finishing. Casement windows are faster β€” 2–3 per day is typical. A terraced house with 6–8 windows takes approximately 3–5 days. Larger properties or those requiring structural work may take longer.

πŸ‡¬πŸ‡§ Made in UK Β· 4–5 Week Delivery

Start Your Project Today

Design your windows in 3D and get an instant price. Book a survey to lock in your production slot.

Price My Windows

Design Your Windows in 3D

Choose dimensions, colours, glazing bars, and glass type. Get an instant price — no waiting, no chasing quotes.

Get Your Price    Book a Free Survey