6β8 Weeks. Not 12β16.
Most timber window companies quote 8β12 weeks for delivery. Some stretch to 16 weeks. The reason is simple: they import windows from overseas factories. Your order joins a shipping container, crosses an ocean, clears customs, and eventually arrives at a warehouse. If anything is wrong β a colour mismatch, a measurement error, a damaged frame β you wait another 8β12 weeks for a replacement.
We manufacture every window in our workshop near London. Raw timber arrives, and finished windows leave β typically within 6β8 weeks of order confirmation. No shipping containers. No customs delays. No overseas middlemen. If a problem arises, we fix it in days, not months.
Why We Are Faster
UK Workshop, Not a Foreign Factory
Our workshop is near London. We control every stage of production: timber preparation, machining, assembly, glazing, painting, and quality inspection. There is no supply chain stretching across continents. When your order is confirmed, it goes straight into our production schedule.
Direct to You
We sell direct β no distributors, no showroom chains, no regional agents. Your order goes from our workshop to your property. Fewer steps means fewer delays.
Stock Timber Ready to Go
We maintain stock of the most popular timber sections (engineered Accoya and premium hardwood) in standard profiles. This eliminates the wait for raw material that delays many manufacturers. When your order arrives, the timber is already in our workshop.
What 6β8 Weeks Actually Means
| Stage | Timeline |
|---|---|
| Order confirmed & deposit received | Day 0 |
| Timber preparation & cutting | Week 1 |
| Machining, assembly & glazing | Week 2β4 |
| Painting (primer, undercoat, topcoat) | Week 5β6 |
| Quality inspection & dispatch | Week 7β8 |
For standard configurations (sash windows, casement windows, French doors in standard sizes and colours), 6β8 weeks from order to delivery is our standard lead time. Bespoke designs β arched windows, unusual shapes, or complex configurations β may require additional time, which we confirm at the point of order.
Compare Our Lead Time
| Supplier Type | Typical Lead Time | Why |
|---|---|---|
| Large national brands (Everest, Anglian) | 8β12 weeks | Complex sales process, centralised production |
| Import-based suppliers | 10β16 weeks | Overseas manufacturing + shipping + customs |
| Small local joiners | 6β10 weeks | Limited capacity, one-man operations |
| Prime Sash Windows | 6β8 weeks | UK workshop, direct supply, stock timber |
When Fast Delivery Matters Most
Speed is not a luxury β in many situations, it is essential. Builders working to completion deadlines cannot afford a 12-week wait for windows. Homeowners preparing a property for sale need work finished quickly. Renovation projects with scaffolding up are burning money every week windows are delayed. Tenants waiting to move in, conservation officers waiting for compliance, insurance claims that need resolution β all of these need windows delivered on time.
We built our production process around speed because we understand that late windows cause real financial damage. A builder with scaffolding up for an extra 6 weeks, or a homeowner paying rent while waiting for a delayed installation, loses far more than the cost of the windows themselves.
Same-Month Delivery
For urgent orders, we offer same-month delivery on standard configurations, subject to workshop capacity. If you need windows before a specific deadline β a completion date, a tenancy start, or a building control inspection β contact us directly and we will confirm whether your timeline is achievable before you commit.
π¬π§ Made in UK Β· 6β8 Week Delivery
Get Your Price Now
Design your windows in 3D. Instant price, no waiting. Standard orders delivered in 6β8 weeks.
Open the Configurator Discuss Your Deadline