Why Developers Choose Timber
New-build projects in Conservation Areas, heritage settings, and premium developments increasingly specify timber windows. Planning authorities may require timber as a condition of consent. Buyers of high-end properties expect it. And with modern engineering β laminated sections, factory-applied coatings, warm-edge glazing β timber now matches or exceeds the thermal performance of aluminium and uPVC while looking incomparably better.
Meeting Building Regulations
Part L β Thermal Performance
Our double-glazed windows achieve a U-value of 1.4 W/m²K β comfortably below the Part L 2021 requirement of 1.6 W/m²K for replacement windows. Triple glazing brings this to 1.0 W/m²K, and our passive glass option achieves 0.8 W/m²K for Passivhaus-level performance. We provide U-value calculations and thermal data for your SAP assessment.
Part Q β Security (via PAS24)
All our windows meet PAS24 enhanced security as standard β multi-point locking, toughened glass, and reinforced frames. PAS24 compliance is a requirement under Approved Document Q for all new dwellings. We provide test certificates and installation documentation.
FENSA Certification
Our installations are FENSA registered, providing Building Regulations self-certification. Each completed installation receives a FENSA certificate β essential documentation for property conveyancing and warranty purposes.
Project Supply at Scale
We supply timber windows for developments from 2 to 50+ units. Our workshop capacity handles multi-unit projects with scheduled deliveries aligned to your build programme. Windows are manufactured in batches and delivered plot-by-plot or in bulk β whichever suits your site logistics.
Delivery Aligned to Your Programme
Late window deliveries derail build programmes. We confirm delivery dates at the point of order and build production schedules around your programme milestones. Our 4β5 week standard lead time means windows can be ordered after first fix and delivered before second fix β keeping your programme on track without warehousing windows for months.
| Project Phase | Window Action |
|---|---|
| Planning / pre-construction | Specify windows, obtain planning approval drawings |
| Foundations / substructure | Confirm final dimensions, place order |
| First fix | Windows in production (4β5 weeks) |
| Pre-second fix | Windows delivered to site |
| Second fix | Windows installed, FENSA certified |
Specification Support
We provide architects and developers with detailed specifications, CAD drawings, thermal calculations, and material data sheets. If you are preparing a planning application that specifies timber windows, we can supply the technical documentation planning officers need to approve the application.
Product Range for New Builds
- Sash windows β for heritage and Conservation Area projects
- Flush casements β clean modern aesthetic with traditional construction
- French doors β inward or outward opening, single or double leaf
- Sliding doors β 2β4 panels, large glazed openings
- Bi-fold doors β 2β8 panels, folding to one or both sides
- Fix-frame β all shapes including arched for feature windows
All products available in any RAL colour, Farrow & Ball, or dual colour. Consistent finishes across an entire development β every window colour-matched from the same spray booth.
π¬π§ Made in UK Β· 4β5 Week Delivery
Discuss Your Project
Contact us with your plans or specification. We will provide a project quote and delivery schedule.
Get in Touch Price Individual Windows